- mark every batch B0→B15 + B-UI ✅ (automatable scope run, green, findings archived)
- cycle log: Phase 2 complete (14 fixed) + clean automated re-run (0 new)
- document non-blocking external-infra residuals carried to Cycle 2
- exit criteria all checked
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
|
||
|---|---|---|
| .. | ||
| images | ||
| Authentik-Integration.md | ||
| CSRF-SPA-Setup.md | ||
| Engineering_Reference_Manual.md | ||
| Engineering_Reference_promp.md | ||
| QA_PLAN.md | ||
| RATE_LIMITING_ENHANCEMENT.md | ||
| ROADMAP_REDESIGN_PLAN.md | ||
| ROADMAP_UI_AUDIT.md | ||
| UI_IMPROVEMENTS.md | ||
| advisory_non_bill_transaction_filters_us_ms_5000.json | ||
| cents-migration-plan.md | ||
| merchant_store_match_us_nems_online_5k_v0_2.json | ||
| top_200_us_subscriptions.csv | ||
| top_200_us_subscriptions_researched_2026-06-06.json | ||