docs: adopt project template, retire the markdown backlog This repository is the one the template's README describes: 205 issues, zero milestones, and severity labels spelled "P0 Critical" / "P1 High" / "P2 Medium", which privacyllc.dev reports as NOT ADOPTED rather than as 87% complete. Six markdown records described the same work and none pointed at the tracker. Two of them said the project was in "Phase 5" while the code was at 0.9.3. Migrated, then deleted in this commit: FUTURE.md -> docs/history/BATCH_LEDGER.md (Archived). Its open items were all already filed as issues, so nothing needed migrating into the tracker HISTORY.md -> docs/history/DEVELOPMENT_LOG.md, verbatim, 0 lines lost DEVELOPMENT_LOG.md -> the same file, as a second labelled block. Not interleaved: the changelog has three duplicated version headings, so one date order would have implied more than the record supports PROJECT.md -> docs/planning/PROJECT_PLAN.md STRUCTURE.md -> the agent pipeline into README.md; its versioning rules retired BUILD_SUMMARY.md -> BATCH_LEDGER.md. Its embedded SQL schema deliberately NOT carried: it predated the UNIQUE constraint on leads.email, and server/index.js owns the schema SCRIPTS.md -> docs/TOOLS.md, corrected for the SSR + prerender build Moved with history (git detects all four as renames): OVERHAUL_PLAN.md, review.md, project-requirements.md, docs/zoho-setup.md Kept because this project earned them: the five-agent pipeline, the design system in OVERHAUL_PLAN.md (Status: Current, with a front-note saying which half is history), the positioning argument in REDESIGN_REVIEW.md, and REQUIREMENTS.md whole, including its change policy. Deleted from the template because they do not apply, each said out loud in DOC_TRUST_MAP.md: QA pass I (no money moves), the authorisation checklist group and the session-token row (no accounts, no sessions), and one PRECAUTIONARY paragraph in SECURITY.md about holding credentials on behalf of users — there are none, and PROJECT_PLAN.md records accounts as out of scope. Pass H was kept and rewritten: its authorisation half does not apply, its what-a-stranger-can- reach half is the most exposed surface here. Also removed: main.js, the old static site's hash router, referenced by nothing and preserved in .drop/; and test-results/.last-run.json, a May Playwright artifact reading {"status":"failed"} for a suite that does not exist. The repository was made private on Forgejo before this commit. That is what let the internal history be committed rather than exempted — null/fruit-fall is already private and reports normally. Two defects found on the way in and fixed here: zoho-setup.md told admins to edit `server/zoho/`, a directory that has never existed in any commit (the mapping is in server/index.js), and README.md's route list still advertised /8x8, removed at 0.6.6, while omitting /privacy-policy. Branding: icon.webp and logo.webp converted from this project's own marks in assets/. banner.webp is absent and is filed as an issue rather than faked. Verified: verify.sh 3/3, doc-claims 71 claimed paths all present, backup and a first-ever restore of the live leads database (2 tables, 3 rows, under 1s). Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-08-18 01:19:02 -05:00
# History — Queue North Website
```
Status: Current
Owner: _null
Last reviewed: 2026-08-18
Governs: the narrative of how this project got to where it is
Review trigger: A decision reversed, a direction abandoned, or a rewrite
```
## What this is for
Queue North Technologies had a working website: one large `index.html`, a
hand-written stylesheet, and `main.js` doing hash-based routing. The content was
good and the presentation was early-2000s. This repository is the rebuild — a
fix(infra): queuenorth.com is the production origin, and it is this deployment _null confirmed queuenorth.com as the permanent public origin, which settles #212 and exposed a wrong claim written earlier the same day. docs/OPERATIONS.md said queuenorth.com "is not this deployment ... do not diagnose against it". That came from a DNS lookup and an assumption. It is this deployment: both hostnames serve the identical bundle and this server's own /api/health shape, 24.41.108.95 is this network's own public IP, and both reach qn-website-dev on nebula — queuenorth.com through nginx-proxy-manager on thor/exodus, qn.isnull.dev through Cloudflare. Two front doors, one container, no non-production environment. That is the worst direction for a runbook to be wrong in, so the correction quotes the wrong sentence rather than replacing it silently. The QA Round 0 table likewise gained the production observations as extra rows instead of having its originals rewritten. Dockerfile: the CORS_ORIGIN fallback was '*'. The server sets credentials:true and browsers reject '*' with credentials outright, so that fallback would have broken every form rather than over-permitting. Now the real origin. healthcheck.sh and preflight.sh now watch production by default, with the second front door reachable through their env overrides — the two ingresses terminate TLS in different places and can rot independently. Also fills a gap adoption left explicitly undone: the deploy path is a Portainer stack, id 58 on nebula, found from the container's own compose labels. OPERATIONS.md documents it, including that the stack file is a separate copy from this repository's docker-compose.yml and the two have already drifted. That drift is all that remains of #212 — one trailing slash on line 21 of the stack file. Left in place: nothing is broken today, and fixing it recreates the container and takes both front doors down together. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-08-18 02:08:12 -05:00
Vite + React SPA with an Express API behind it, live at `queuenorth.com`.
docs: adopt project template, retire the markdown backlog This repository is the one the template's README describes: 205 issues, zero milestones, and severity labels spelled "P0 Critical" / "P1 High" / "P2 Medium", which privacyllc.dev reports as NOT ADOPTED rather than as 87% complete. Six markdown records described the same work and none pointed at the tracker. Two of them said the project was in "Phase 5" while the code was at 0.9.3. Migrated, then deleted in this commit: FUTURE.md -> docs/history/BATCH_LEDGER.md (Archived). Its open items were all already filed as issues, so nothing needed migrating into the tracker HISTORY.md -> docs/history/DEVELOPMENT_LOG.md, verbatim, 0 lines lost DEVELOPMENT_LOG.md -> the same file, as a second labelled block. Not interleaved: the changelog has three duplicated version headings, so one date order would have implied more than the record supports PROJECT.md -> docs/planning/PROJECT_PLAN.md STRUCTURE.md -> the agent pipeline into README.md; its versioning rules retired BUILD_SUMMARY.md -> BATCH_LEDGER.md. Its embedded SQL schema deliberately NOT carried: it predated the UNIQUE constraint on leads.email, and server/index.js owns the schema SCRIPTS.md -> docs/TOOLS.md, corrected for the SSR + prerender build Moved with history (git detects all four as renames): OVERHAUL_PLAN.md, review.md, project-requirements.md, docs/zoho-setup.md Kept because this project earned them: the five-agent pipeline, the design system in OVERHAUL_PLAN.md (Status: Current, with a front-note saying which half is history), the positioning argument in REDESIGN_REVIEW.md, and REQUIREMENTS.md whole, including its change policy. Deleted from the template because they do not apply, each said out loud in DOC_TRUST_MAP.md: QA pass I (no money moves), the authorisation checklist group and the session-token row (no accounts, no sessions), and one PRECAUTIONARY paragraph in SECURITY.md about holding credentials on behalf of users — there are none, and PROJECT_PLAN.md records accounts as out of scope. Pass H was kept and rewritten: its authorisation half does not apply, its what-a-stranger-can- reach half is the most exposed surface here. Also removed: main.js, the old static site's hash router, referenced by nothing and preserved in .drop/; and test-results/.last-run.json, a May Playwright artifact reading {"status":"failed"} for a suite that does not exist. The repository was made private on Forgejo before this commit. That is what let the internal history be committed rather than exempted — null/fruit-fall is already private and reports normally. Two defects found on the way in and fixed here: zoho-setup.md told admins to edit `server/zoho/`, a directory that has never existed in any commit (the mapping is in server/index.js), and README.md's route list still advertised /8x8, removed at 0.6.6, while omitting /privacy-policy. Branding: icon.webp and logo.webp converted from this project's own marks in assets/. banner.webp is absent and is filed as an issue rather than faked. Verified: verify.sh 3/3, doc-claims 71 claimed paths all present, backup and a first-ever restore of the live leads database (2 tables, 3 rows, under 1s). Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-08-18 01:19:02 -05:00
That much is in the code. What is not in the code is which walls were already
walked into, and that is what this file is for.
**This is a record of *then*, never a description of *now*.** That distinction is
what makes it safe to leave alone as the project changes — a history document
that gets edited to stay current is not a history, it is a second and competing
description of the present.
If you find yourself updating a sentence here because the code changed, the
sentence belongs somewhere else.
## Decisions and their reasons
| When | What was decided | Why, at the time |
| --- | --- | --- |
| 2026-05-11 | Vite + React SPA, explicitly **not** Next.js | The rebuild needed a fast client and a small Express API, not SSR or server components. `docs/planning/REQUIREMENTS.md` states it as a requirement rather than a preference, because it kept getting re-proposed |
| 2026-05-11 | better-sqlite3 rather than a hosted database | Two forms and two tables. A managed database would have been more infrastructure than the product has data |
| 2026-05-12 | Light-first B2B layout with strategic dark navy, evolving the palette rather than replacing it | `docs/design/REDESIGN_REVIEW.md`: the original read as a developer portfolio, and B2B buyers decide on trust in seconds. Rip-and-replace to a light theme would have thrown away the navy brand equity along with the problem |
| 2026-05-13 | Zoho forwarding is fire-and-forget, behind SQLite | SQLite always writes first. A CRM outage must never cost a lead — the local row is the record and Zoho is a best-effort overlay |
| 2026-05-17 | The standalone `/8x8` page was merged into the UCaaS and CCaaS service entries | Issue #32. A partner page nobody navigated to, when the partnership is better evidenced inside the services it actually powers |
| 2026-06-14 | Zoho switched from the REST/OAuth path to **WebToLead** as the default mode | `ZOHO_FORWARDING_MODE=webtolead`. The OAuth path works and is kept as a standby; WebToLead needed no token lifecycle for what is a single lead form |
| 2026-08-01 | Every route is prerendered at build time, and the privacy policy has a server-rendered fallback | Meta's crawler does not run JavaScript. See `docs/architecture/README.md` |
| 2026-08-18 | Adopted the project template; **retired phase-versioning** | See below |
fix(infra): queuenorth.com is the production origin, and it is this deployment _null confirmed queuenorth.com as the permanent public origin, which settles #212 and exposed a wrong claim written earlier the same day. docs/OPERATIONS.md said queuenorth.com "is not this deployment ... do not diagnose against it". That came from a DNS lookup and an assumption. It is this deployment: both hostnames serve the identical bundle and this server's own /api/health shape, 24.41.108.95 is this network's own public IP, and both reach qn-website-dev on nebula — queuenorth.com through nginx-proxy-manager on thor/exodus, qn.isnull.dev through Cloudflare. Two front doors, one container, no non-production environment. That is the worst direction for a runbook to be wrong in, so the correction quotes the wrong sentence rather than replacing it silently. The QA Round 0 table likewise gained the production observations as extra rows instead of having its originals rewritten. Dockerfile: the CORS_ORIGIN fallback was '*'. The server sets credentials:true and browsers reject '*' with credentials outright, so that fallback would have broken every form rather than over-permitting. Now the real origin. healthcheck.sh and preflight.sh now watch production by default, with the second front door reachable through their env overrides — the two ingresses terminate TLS in different places and can rot independently. Also fills a gap adoption left explicitly undone: the deploy path is a Portainer stack, id 58 on nebula, found from the container's own compose labels. OPERATIONS.md documents it, including that the stack file is a separate copy from this repository's docker-compose.yml and the two have already drifted. That drift is all that remains of #212 — one trailing slash on line 21 of the stack file. Left in place: nothing is broken today, and fixing it recreates the container and takes both front doors down together. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-08-18 02:08:12 -05:00
| 2026-08-18 | **`queuenorth.com` is the permanent public origin**, with `qn.isnull.dev` kept as a second ingress to the same container | Asked and answered by `_null` while closing out the template adoption. It settles #212 and it corrected a mistake made earlier the same day: the first draft of `docs/OPERATIONS.md` asserted `queuenorth.com` was *not* this deployment, written from a DNS lookup rather than a request. Both hostnames serve the identical bundle and this server's own `/api/health` shape; `24.41.108.95` is this network's own public IP |
docs: adopt project template, retire the markdown backlog This repository is the one the template's README describes: 205 issues, zero milestones, and severity labels spelled "P0 Critical" / "P1 High" / "P2 Medium", which privacyllc.dev reports as NOT ADOPTED rather than as 87% complete. Six markdown records described the same work and none pointed at the tracker. Two of them said the project was in "Phase 5" while the code was at 0.9.3. Migrated, then deleted in this commit: FUTURE.md -> docs/history/BATCH_LEDGER.md (Archived). Its open items were all already filed as issues, so nothing needed migrating into the tracker HISTORY.md -> docs/history/DEVELOPMENT_LOG.md, verbatim, 0 lines lost DEVELOPMENT_LOG.md -> the same file, as a second labelled block. Not interleaved: the changelog has three duplicated version headings, so one date order would have implied more than the record supports PROJECT.md -> docs/planning/PROJECT_PLAN.md STRUCTURE.md -> the agent pipeline into README.md; its versioning rules retired BUILD_SUMMARY.md -> BATCH_LEDGER.md. Its embedded SQL schema deliberately NOT carried: it predated the UNIQUE constraint on leads.email, and server/index.js owns the schema SCRIPTS.md -> docs/TOOLS.md, corrected for the SSR + prerender build Moved with history (git detects all four as renames): OVERHAUL_PLAN.md, review.md, project-requirements.md, docs/zoho-setup.md Kept because this project earned them: the five-agent pipeline, the design system in OVERHAUL_PLAN.md (Status: Current, with a front-note saying which half is history), the positioning argument in REDESIGN_REVIEW.md, and REQUIREMENTS.md whole, including its change policy. Deleted from the template because they do not apply, each said out loud in DOC_TRUST_MAP.md: QA pass I (no money moves), the authorisation checklist group and the session-token row (no accounts, no sessions), and one PRECAUTIONARY paragraph in SECURITY.md about holding credentials on behalf of users — there are none, and PROJECT_PLAN.md records accounts as out of scope. Pass H was kept and rewritten: its authorisation half does not apply, its what-a-stranger-can- reach half is the most exposed surface here. Also removed: main.js, the old static site's hash router, referenced by nothing and preserved in .drop/; and test-results/.last-run.json, a May Playwright artifact reading {"status":"failed"} for a suite that does not exist. The repository was made private on Forgejo before this commit. That is what let the internal history be committed rather than exempted — null/fruit-fall is already private and reports normally. Two defects found on the way in and fixed here: zoho-setup.md told admins to edit `server/zoho/`, a directory that has never existed in any commit (the mapping is in server/index.js), and README.md's route list still advertised /8x8, removed at 0.6.6, while omitting /privacy-policy. Branding: icon.webp and logo.webp converted from this project's own marks in assets/. banner.webp is absent and is filed as an issue rather than faked. Verified: verify.sh 3/3, doc-claims 71 claimed paths all present, backup and a first-ever restore of the live leads database (2 tables, 3 rows, under 1s). Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-08-18 01:19:02 -05:00
| 2026-08-18 | The Forgejo repository was made **private** | Adoption committed the previously-gitignored internal documents into `docs/`. Those hold the agent narrative and internal findings about the client's own marketing claims (#108, #110), which is not material for a public tree. `null/fruit-fall` was already private and reports to the Command Center normally, so nothing was lost by it |
## What was tried and dropped
### Phase-versioning — the minor number *was* the phase number
`PROJECT.md` and `STRUCTURE.md` both carried the rule: Phase 1 releases are
`0.1.x`, Phase 5 releases are `0.5.x`, and *"do not use unrelated semantic
version bumps during the overhaul"*. Bishop was made responsible for enforcing it
across `package.json`, `PROJECT.md` and `HISTORY.md`.
**It drifted twice, and the second time nobody noticed for two and a half
months.** At adoption `package.json` said `0.8.3` while the last four commit
subjects said *batch 0.9.0* through *batch 0.9.3*, and both `PROJECT.md` and
`STRUCTURE.md` still described the project as being in Phase 5.
The rule was not wrong; it was unenforceable. It asked four files to agree, with
a human check as the only mechanism, and a rule that needs a person to remember
it is a rule that decays. Milestones in the tracker now hold what the phase
number was carrying — a batch is a milestone, and closing it is what marks the
batch shipped — so the version number no longer has to encode anything.
`package.json` was corrected to `0.9.3` on adoption to match the commits.
**What replaced it:** nothing, deliberately. Version numbers are now just version
numbers. `docs/WORK_CYCLE.md` holds what happens at the end of a piece of work.
### The markdown backlog
Work was planned in `FUTURE.md`, with a parallel changelog in `HISTORY.md`, an
agent log in `DEVELOPMENT_LOG.md`, phase checklists in `PROJECT.md` and
`README.md`, and 205 issues in Forgejo. Six records of what was happening, and
the tracker — the one with atomic state and real timestamps — was the one nothing
pointed at.
The specific damage: 205 issues sat in **zero** milestones, so privacyllc.dev
reported the project as *not adopted* rather than as 87% complete, and the
severity labels were spelled `P0 Critical` / `P1 High` / `P2 Medium`, which no
query matches.
The markdown records were retired on 2026-08-18. What was reasoning is now in
`docs/history/BATCH_LEDGER.md`; what was work is in the tracker.
### The agent pipeline — kept, not dropped
Scarlett designs, Neo implements, Private Hudson reviews security, Bishop
verifies, Ripley owns git. Agents do not touch git; Ripley commits and pushes.
This survived adoption because the project earned it — `.learnings/` holds four
agents' accumulated notes and error logs against it — and because nothing in the
template contradicts it. `docs/WORK_CYCLE.md` says what must be true when a piece
of work ends; the pipeline says who does which part. They are different questions.
The one piece of the pipeline that did not survive is Bishop's version-checking
duty, which went with phase-versioning above.
## What this file is not
- **Not the plan.** That is `docs/planning/PROJECT_PLAN.md`.
- **Not the work list.** Open work lives in the tracker as milestones and issues.
- **Not a changelog.** Dated entries go in `docs/history/DEVELOPMENT_LOG.md`.