Batch 8.0: Testimonials/Case Studies Section #69

Open
opened 2026-05-17 18:10:44 -05:00 by null · 0 comments
Owner

Phase 7 — Batch 7.0: Testimonials/Case Studies

What to build:

  • Dedicated testimonials or case studies section on the Home page
  • B2B trust signals — real quotes from real clients
  • Case study cards showing: problem → solution → outcome
  • Mobile-first responsive layout

Prerequisites:

  • Needs real content from _null — client names, quotes, outcomes
  • Cannot proceed with placeholder content

Design notes:

  • B2B buyers look for social proof after trust signals
  • Keep it concise — 2-3 testimonials max for launch
  • Case studies should show measurable outcomes ("reduced downtime by X%")
  • Use Georgia font for any metrics/numbers (consistent with existing design)

Deferred from Phase 6 planning. Requires owner-provided content before starting.

## Phase 7 — Batch 7.0: Testimonials/Case Studies ### What to build: - Dedicated testimonials or case studies section on the Home page - B2B trust signals — real quotes from real clients - Case study cards showing: problem → solution → outcome - Mobile-first responsive layout ### Prerequisites: - **Needs real content from _null** — client names, quotes, outcomes - Cannot proceed with placeholder content ### Design notes: - B2B buyers look for social proof after trust signals - Keep it concise — 2-3 testimonials max for launch - Case studies should show measurable outcomes ("reduced downtime by X%") - Use Georgia font for any metrics/numbers (consistent with existing design) --- _Deferred from Phase 6 planning. Requires owner-provided content before starting._
null added the
phase-7
owner-input
content
labels 2026-05-17 18:10:44 -05:00
null removed the
phase-7
label 2026-05-17 18:52:14 -05:00
null added the
phase-8
label 2026-05-17 18:53:27 -05:00
null changed title from Testimonials/Case Studies Section to Batch 8.0: Testimonials/Case Studies Section 2026-05-17 18:55:10 -05:00
Sign in to join this conversation.
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: null/Queue-North-Website#69
No description provided.